18 Sep
2019

Event CEO Networking

Worximity is proud to participate at the CEO Networking event hosted by Fond de solidarité FTQ. Today at Grand Quai du Port de Montréal.

Continuous Improvement
Industry 4.0
Technology
IIoT
Event CEO Networking

Worximity is proud to participate at the CEO Networking event hosted by Fond de solidarité FTQ. Today at the Grand Quai du Port de Montréal.

We will talk about the transition to the Industry 4.0 through our technology.

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
10
Dec 2021

Digital Food Production Factory Monitoring Dashboard Examples to Visualize Factory Performance

English
16
Feb 2021

Quels paramètres du lean manufacturing utilisés pour calculer le TRG devez-vous toujours mesurer?

French
11
Mar 2020

14 points de Deming dans l'industrie manufacturière

French

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
3
Sep 2018

Measuring OEE - Overall Equipment Effectiveness

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

English
21
Aug 2018

Continuous Improvement Analysis to Reduce Rejects

Measuring Rejects and Non-Quality is essential to both lean manufacturing and continuous improvement initiatives. Learn about continuous improvement analysis methods here.

English
14
Oct 2019

What’s Missing From Your Continuous Improvement Plan?

Continuous improvement programs fail because of a lack of proper tools. Worximity’s smart factory analytics offer the support every program needs.

English