15 Mar
2022

2 Ways to Improve Availability Loss and How It Can Improve Your OEE

Need to improve your factory’s OEE? Start with improving your factory’s availability loss rate.

OEE
OEE in Manufacturing Industry
Smart Factory
2 Ways to Improve Availability Loss and How It Can Improve Your OEE
OEE
OEE
OEE in Manufacturing Industry
OEE in Manufacturing Industry
Smart Factory
Smart Factory
Food & Beverages Processing
Text Link
Consumer Product Goods
Text Link
Material Building & Construction
Text Link
Original Equipment Manufacturer (OEM)
Text Link
Pharmaceuticals & Supplements
Text Link
Packaging & Co-manufacturing
Text Link
Text Link

Measuring equipment availability reveals the percentage of time that machines and processes actually run and are available for production versus what is planned. This availability is referred to as uptime, and it’s an important metric for factories to not just measure but also refine.

 

Availability loss encompasses anything that impedes planned production for a specified time period. Common types of availability loss include unplanned equipment maintenance, longer changeovers, and material shortages. For factories, availability loss is part of the overall equipment effectiveness (OEE) manufacturing metric, along with speed loss and quality loss.   

 

Using Availability Loss as an OEE Value

Measuring availability loss is crucial, but availability is just one of the three values that OEE measures

OEE measures three components:

  • Availability—actual operating time versus planned production time
  • Efficiency—ideal cycle time versus actual operating time
  • Quality—planned good pieces versus actual good pieces

OEE formula:


  • OEE = availability x efficiency x quality

When a factory has production line values for each of these components, it can calculate OEE by multiplying the three components to determine an overall value. 

Availability is an important OEE value. Events that create loss of availability include everything from unplanned equipment failures to planned stops such as changeover time.

Let’s take a look at two ways to improve availability loss and OEE. 

 

1. Measure, Benchmark, and Identify Opportunities 

Measuring OEE to get benchmark data can reveal valuable information about your factory’s true availability. Managers find that changeover time is a common improvement area when it comes to equipment availability loss. 

Though changeovers are included in the OEE analysis as a planned stop—and it is almost impossible for most factories to eliminate manual changeover times—measuring actual changeover time versus planned changeover time could reveal that processes aren’t happening as quickly as they should. It could be as simple as someone realizing that two changeover steps could be combined into one, saving minutes that add up quickly.

Let’s look at a cut-and-dried example. Say your factory is going through 40 changeovers a day with planned downtime of 20 minutes for each changeover. That’s a total of 800 minutes—or nearly 13 hours—of planned downtime. 

However, when you perform an OEE analysis, you can clearly see that manual production line changeovers are inconsistent and not within the planned downtime—and you can also clearly see how these changeovers can be improved.

2. Identify, Prioritize, and Strategize 

Once you have the data you need, it’s time to take action. First, identify all time-saving opportunities, from human to machine performance. Using lean manufacturing’s single-minute exchange of die (SMED) system can help seriously reduce changeover time. The SMED systems convert as many changeovers as possible to be performed while the equipment is still running, and then simplify remaining steps.

Going back to our example of the 20-minute changeovers, let’s say that an OEE analysis reveals a time-saving measure that could reduce changeover time to 10 minutes. Often, the opportunity to reduce planned downtime is relatively simple or more obvious than you imagined. 

It could be that the operators performing manual changeovers are inconsistent with their timing or that different shifts have different ways of doing changeovers. When you identify one streamlined way of performing the changeover, you can save valuable minutes or even hours of downtime each day.

 

Show Value: Availability Loss Data’s Direct Impact on Fixed Costs

By measuring OEE to set benchmarks, factories frequently realize they haven’t been hitting their set planned downtime parameters—but they also discover new ways to reduce downtime. For example, because of the visibility and data discoveries, you can reduce steps by planning a better product order and create more efficient task distribution among operators.

These efficiencies reduce downtime—saving costs—and these wins should be communicated to the decision makers. That’s why these results from OEE efforts are so crucial. Once you redefine availability and quantify the cost-saving opportunities, you take the OEE results to the financial decision makers and show them the direct impact on fixed costs. By analyzing your OEE, you find ways to continually improve your OEE.

 

Use Digital Technology to Determine OEE and Improve Availability Loss

These days, digital technology provides us with comprehensive and precise ways to measure OEE. With digital tools like Worximity’s Smart Factory analytics software, manufacturers are better equipped to get the most accurate data about factory performance. Using digital sensors, Wi-Fi, and a real-time dashboard, managers can monitor accurate factory performance, making continuous improvement efforts more meaningful.

 

Start with an OEE analysis. Give our OEE calculator a try and take the first steps toward maximizing your availability rate.

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
15
Nov 2023

Decoding the OEE Calculation: Translating OEE Metrics into Tangible Losses

The following OEE funnel is a great way to visualize how losses in availability, performance, and quality impact OEE and your throughput.

English
16
Oct 2023

The Synergy Between Lean Manufacturing and OEE Monitoring

Overall Equipment Effectiveness (OEE) monitoring plays a crucial role in the realm of lean manufacturing, serving as an essential tool to assess and enhance the efficiency and productivity of manufacturing processes.

English
25
Jul 2023

Breaking Down OEE for Shop Floor Success

Discover how breaking down Overall Equipment Effectiveness (OEE) into relevant metrics for the shop floor drives operational success.

English

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
13
Mar 2024

Moteurs d’efficacité manufacturière : Monitoring des machines et du TRG

Le monitoring des machines et du TRG (taux de rendement global) sont efficaces pour améliorer l'efficacité globale, mais quelle est la différence entre eux et qu'est-ce qui est le mieux adapté à vos opérations?

French
13
Mar 2024

Engines of Manufacturing Efficiency: Machine Monitoring and OEE

Machine Monitoring and OEE (Overall Equipment Effectiveness) are effective at boosting overall efficiency, but what is the difference between them and what is best for your operations?

English
20
Feb 2024

Comment les entreprises ont mis en oeuvre les 14 points de Deming dans le secteur manufacturier

Les 14 points de gestion de Deming ainsi que la suite d'outils de performance de Worximity stimulent l'amélioration et l'innovation dans le secteur manufacturier.

French
16
Feb 2024

Principales différences entre la fabrication discrète et la production par processus

Découvrez le rôle essentiel que joue votre logiciel dans la fabrication discrète et dans la production par processus.

French