28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
Comment utiliser l'OEE dans la fabrication intelligente

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
23
mai 2024

Exemples de Lean Manufacturing provenant des principaux leaders de l’industrie

French
9
Janvier 2024

Manufacturing Trends to Lookout for in 2024

English
16
Oct. 2023

The Synergy Between Lean Manufacturing and OEE Monitoring

English

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
17
Juin 2019

Succeeding in Industry 4.0 with Agile Leadership

The key to success for companies shifting to Industry 4.0 will be to foster agile leadership early on in the transition. Learn more about this approach.

English
29
mai 2019

4 Steps to Turn Your Plant Into a Smart Factory

Turning your plant into a smart factory is easier than it seems if you follow these four steps!

English
6
Avril 2018

Amélioration continue: être stratégique avec vos données

Vous avez un outil de suivi en temps réel et des données à votre disposition pour contrôler votre production. Découvrez comment prendre les meilleures décisions et améliorer la performance de votre usine en vous basant sur ces données dans une démarche d'amélioration continue.

French